GeoGuides

ISGS lecture

$1.00

Category:

Description

The original requirement for preliminary piles testing was for verifying the pile lengths
that have been given in the SI report (issued by the Lab). Hence, testing the trial piles
should have been after design is completed. The agreement with the project owner was
altered to optimize pile lengths.